• Español
    • Newsletter Miraflores
    • Noticias de Interés
  • English
    • Newsletter Miraflores
    • Latest News of Interest
  • Menu
  • Skip to right header navigation
  • Saltar al contenido principal

Newsletter Miraflores

Newsletter Miraflores

  • Español
    • Newsletter Miraflores
    • Noticias de Interés
  • English
    • Newsletter Miraflores
    • Latest News of Interest

On the 8th, work begins on the remodelling of the pedestrian walkway linking Miraflores with the beach.

Miraflores, 04/04/2024

Miraflores Grand Community celebrates the start of work on the remodelling of the pedestrian bridge that connects our urbanisations with the beach and the Ronda Litoral promenade.

A renovated bridge for a safe community

The existing pedestrian bridge was in a state of disrepair which was of concern to residents. Its structure needed urgent improvements to avoid risks and lack of safety for users.

A joint effort

The refurbishment of the pedestrian bridge has been a priority for the administrator of Miraflores Grand Community and the management team. For this project, leading companies in this type of construction, such as Retineo and Cemosa, have been contracted and have put all their experience at the service of the community.

Leading companies at the forefront of the project

  • Retineo: Experts in Refurbishment and Restoration

Retineo, with its extensive experience in engineering and rehabilitation, will be responsible for carrying out the refurbishment of the bridge. It should be noted that this company has been awarded the government contract for the repair of 12 footbridges on the Costa del Sol.
Their commitment to excellence and track record of success gives us confidence that the new bridge will be a safe structure that will stand the test of time.

  • Cemosa: Quality Assurance

Supervision and quality control of the work will be provided by Cemosa, a leading company in the infrastructure sector. Their rigorous and meticulous approach will ensure that the new bridge meets the highest standards of safety and functionality.

A clear timeline for efficient execution

Start date: 8 April

Duration: approximately 3 months

The refurbishment works on the pedestrian bridge will start on 8 April next and are estimated to last 3 months.

During this time, the bridge will be closed to pedestrian traffic for a maximum of 2 weeks, in order to minimise inconvenience to residents. When this time comes, the dates of the pedestrian traffic interruption will be communicated.

Benefits for a growing community

The refurbishment of the pedestrian bridge will not only provide greater safety for residents who use it daily, but will also strengthen the connection between Miraflores and the beach, promoting mobility and integration with other points along the coast.

A symbol for the community.

This project represents a step forward in the development and improvement of the quality of life in Miraflores. It is a sign of the administration’s commitment to the well-being of residents and to creating a safe and pleasant environment for all.

Appreciation and commitment

Without the drive of Urszulla Karlsson as president and Ole Sigursson as vocal of infrastructure, together with the coordination of more than 3 years by our administrator Meridional, this project would not have been possible.
Choosing the best companies to participate in the project and obtaining advantageous financing to achieve this project, which has been in demand for years, has been a priority at all times.
Both the board of directors and Meridional would like to thank the residents in advance for their patience and understanding during the works.
We are confident that the refurbishment of the pedestrian bridge will be a success and a substantial improvement to our environment for years to come.

Entrada anterior: « El proximo día 8 comienzan las obras de remodelación de la pasarela peatonal que une Miraflores con la playa
Siguiente entrada: Avances significativos en la remodelación del puente peatonal de Miraflores »

Site Footer

MIRAFLORES Ctra. Cádiz N340 km 199 29649 Mijas Costa Málaga Spain

Copyright © 2025 · Miraflores Gran Comunidad