• Español
    • Newsletter Miraflores
    • Noticias de Interés
  • English
    • Newsletter Miraflores
    • Latest News of Interest
  • Menu
  • Skip to right header navigation
  • Saltar al contenido principal

Newsletter Miraflores

Newsletter Miraflores

  • Español
    • Newsletter Miraflores
    • Noticias de Interés
  • English
    • Newsletter Miraflores
    • Latest News of Interest

Further Progress in the Full Renovation of the Miraflores Pedestrian Bridge

The Miraflores Pedestrian Bridge Enters a New Phase of Renovation to Improve Safety and Accessibility

Residents of Hacienda Miraflores will soon notice visible progress in one of the community’s most frequently used structures: the pedestrian bridge. This well-known walkway, which connects key areas of the urbanisation and forms part of many neighbours’ daily routines, is entering a new phase of refurbishment focused on improving safety, accessibility, and comfort for all who use it.

A renovation designed with pedestrians in mind

The planned works include a full structural upgrade of the bridge, featuring a new, safer handrail, non-slip paving, and enhancements to ensure greater durability. Special protective coatings will be applied to guard against wear and tear, and drainage elements will be added to help manage rainwater—contributing to the bridge’s long-term upkeep and functionality.

These improvements go beyond technical updates. They are aimed at ensuring that residents and visitors—especially children, older adults, and people with reduced mobility—can cross the bridge with greater safety and peace of mind.

Temporary closure for safety reasons

To carry out these works, the pedestrian bridge will be closed from 26 May onwards. This temporary measure is necessary to guarantee both pedestrian safety and the smooth execution of the renovation. The bridge will reopen as soon as the construction company confirms it is safe to do so, and residents will be notified through the usual communication channels.

The Conservation Entity would like to thank all residents for their understanding during this brief disruption, and reminds everyone that the ultimate goal is a safer, more modern bridge—adapted to the current needs of the entire community.

Entrada anterior: « Continúan los avances para la remodelación integral del puente peatonal de Miraflores
Siguiente entrada: Finalizan con éxito las obras de rehabilitación del puente peatonal de Miraflores »

Site Footer

MIRAFLORES Ctra. Cádiz N340 km 199 29649 Mijas Costa Málaga Spain

Copyright © 2025 · Miraflores Gran Comunidad